| Prototype Jump Drive Economizer | 4.2 | 20 | 476.2% | 442,900,000.00 | 446,400,000.00 | 636,600,000.00 | 42.6% | 2,669,030,000.00 |
| Experimental Jump Drive Economizer | 36.9 | 27 | 73.2% | 18,800,000.00 | 22,300,000.00 | 38,690,000.00 | 73.5% | 1,142,003,333.34 |
| Limited Jump Drive Economizer | 1.2 | 47 | 3,916.7% | 7,569,000.00 | 11,069,000.00 | 37,650,000.00 | 240.1% | 40,355,000.00 |