| Prototype Jump Drive Economizer | 4.2 | 20 | 476.2% | 391,100,000.00 | 394,600,000.00 | 636,600,000.00 | 61.3% | 2,669,030,000.00 |
| Experimental Jump Drive Economizer | 36.9 | 27 | 73.2% | 15,350,000.00 | 18,850,000.00 | 38,690,000.00 | 105.3% | 1,142,003,333.34 |
| Limited Jump Drive Economizer | 1.2 | 47 | 3,916.7% | 2,197,000.00 | 5,697,000.00 | 37,650,000.00 | 560.9% | 40,355,000.00 |