| Prototype Jump Drive Economizer | 5.6 | 18 | 321.4% | 257,300,000.00 | 260,800,000.00 | 371,900,000.00 | 42.6% | 2,323,370,000.00 |
| Experimental Jump Drive Economizer | 35.5 | 1 | 2.8% | 156,100.00 | 3,656,100.00 | 19,690,000.00 | 438.6% | 675,131,333.35 |
| Limited Jump Drive Economizer | 2.6 | 23 | 884.6% | 1,292,000.00 | 4,792,000.00 | 25,490,000.00 | 431.9% | 65,975,000.00 |