| Prototype Jump Drive Economizer | 8.2 | 11 | 134.1% | 308,900,000.00 | 312,400,000.00 | 419,700,000.00 | 34.3% | 2,723,489,999.99 |
| Experimental Jump Drive Economizer | 29.9 | 19 | 63.5% | 12,000,000.00 | 15,500,000.00 | 19,620,000.00 | 26.6% | 564,139,566.65 |
| Limited Jump Drive Economizer | 1.9 | 28 | 1,473.7% | 5,445,000.00 | 8,945,000.00 | 25,500,000.00 | 185.1% | 48,468,000.00 |