| Standup M-Set Composite Reactor Material Efficiency I
| None | 0 | 0.0% | 281,100,000.00 | 281,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,101,000,000.00 | 2,101,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 971,800,000.00 | 971,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor I
| None | 0 | 0.0% | 2,505,000,000.00 | 2,505,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Basic Capital Component Manufacturing Efficiency
| None | 0 | 0.0% | 3,050,000,000.00 | 3,050,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency II
| None | 0 | 0.0% | 946,000,000.00 | 946,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor I
| None | 0 | 0.0% | 1,035,000,000.00 | 1,035,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 275,100,000.00 | 275,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency I
| None | 0 | 0.0% | 275,100,000.00 | 275,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Material Efficiency II
| None | 0 | 0.0% | 1,601,000,000.00 | 1,601,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 287,900,000.00 | 287,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor II
| None | 0 | 0.0% | 750,000,000.00 | 750,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Advanced Component Manufacturing Efficiency
| None | 0 | 0.0% | 2,452,000,000.00 | 2,452,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency I
| None | 0 | 0.0% | 285,000,000.00 | 285,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency I
| None | 0 | 0.0% | 271,300,000.00 | 271,308,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency II
| None | 0 | 0.0% | 990,100,000.00 | 990,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency I
| None | 0 | 0.0% | 281,100,000.00 | 281,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency I
| None | 0 | 0.0% | 150,000,000.00 | 150,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 325,400,000.00 | 325,408,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor I
| None | 0 | 0.0% | 125,000,000.00 | 125,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency I
| None | 0 | 0.0% | 251,100,000.00 | 251,134,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency I
| None | 0 | 0.0% | 269,600,000.00 | 269,608,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control I
| None | 0 | 0.0% | 1,039,000,000.00 | 1,039,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency II
| None | 0 | 0.0% | 991,000,000.00 | 991,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency I
| None | 0 | 0.0% | 450,000,000.00 | 450,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency II
| None | 0 | 0.0% | 1,601,000,000.00 | 1,601,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 678,700,000.00 | 678,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor II
| None | 0 | 0.0% | 250,000,000.00 | 250,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency II
| None | 0 | 0.0% | 101,400,000.00 | 101,434,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency II
| None | 0 | 0.0% | 945,800,000.00 | 945,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiency
| None | 0 | 0.0% | 246,000,000.00 | 246,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency II
| None | 0 | 0.0% | 980,100,000.00 | 980,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency I
| None | 0 | 0.0% | 312,000,000.00 | 312,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 150,000,000.00 | 150,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 290,500,000.00 | 290,508,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision I
| None | 0 | 0.0% | 82,780,000.00 | 82,788,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 250,000,000.00 | 250,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization II
| None | 0 | 0.0% | 613,000,000.00 | 613,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System I
| None | 0 | 0.0% | 1,028,000,000.00 | 1,028,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Advanced Component Manufacturing Material Efficiency
| None | 0 | 0.0% | 281,000,000.00 | 281,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 981,000,000.00 | 981,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency II
| None | 0 | 0.0% | 1,804,000,000.00 | 1,804,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 990,100,000.00 | 990,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision II
| None | 0 | 0.0% | 290,500,000.00 | 290,508,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 25,000,000.00 | 25,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization I
| None | 0 | 0.0% | 100,000,000.00 | 100,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency I
| None | 0 | 0.0% | 125,000,000.00 | 125,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 980,100,000.00 | 980,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency I
| None | 0 | 0.0% | 360,600,000.00 | 360,608,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 1,260,000,000.00 | 1,260,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 293,000,000.00 | 293,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection I
| None | 0 | 0.0% | 90,000,000.00 | 90,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Laboratory Optimization II
| None | 0 | 0.0% | 100,800,000.00 | 100,834,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator I
| None | 0 | 0.0% | 100,100,000.00 | 100,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer I
| None | 0 | 0.0% | 1,035,000,000.00 | 1,035,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 269,600,000.00 | 269,608,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency II
| None | 0 | 0.0% | 1,572,000,000.00 | 1,572,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 981,000,000.00 | 981,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection II
| None | 0 | 0.0% | 232,500,000.00 | 232,508,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Laboratory Optimization I
| None | 0 | 0.0% | 250,000,000.00 | 250,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator II
| None | 0 | 0.0% | 621,000,000.00 | 621,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,073,000,000.00 | 2,073,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 990,100,000.00 | 990,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency I
| None | 0 | 0.0% | 293,700,000.00 | 293,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency I
| None | 0 | 0.0% | 2,032,000,000.00 | 2,032,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 276,100,000.00 | 276,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection I
| None | 0 | 0.0% | 79,950,000.00 | 79,958,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency I
| None | 0 | 0.0% | 250,000,000.00 | 250,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator II
| None | 0 | 0.0% | 572,600,000.00 | 572,608,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control I
| None | 0 | 0.0% | 1,025,000,000.00 | 1,025,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency I
| None | 0 | 0.0% | 310,500,000.00 | 310,508,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency II
| None | 0 | 0.0% | 1,501,000,000.00 | 1,501,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency II
| None | 0 | 0.0% | 125,000,000.00 | 125,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 945,800,000.00 | 945,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection II
| None | 0 | 0.0% | 235,200,000.00 | 235,208,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency II
| None | 0 | 0.0% | 120,900,000.00 | 120,934,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator I
| None | 0 | 0.0% | 100,100,000.00 | 100,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,032,000,000.00 | 2,032,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency II
| None | 0 | 0.0% | 945,800,000.00 | 945,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor I
| None | 0 | 0.0% | 256,100,000.00 | 256,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency I
| None | 0 | 0.0% | 2,073,000,000.00 | 2,073,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 945,800,000.00 | 945,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy I
| None | 0 | 0.0% | 79,960,000.00 | 79,968,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Thukker Structure and Component Manufacturing Efficiency
| None | 0 | 0.0% | 250,000,000.00 | 250,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization II
| None | 0 | 0.0% | 715,000,000.00 | 715,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array I
| None | 0 | 0.0% | 1,150,000,000.00 | 1,150,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 25,010,000.00 | 25,027,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency I
| None | 0 | 0.0% | 300,000,000.00 | 300,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor II
| None | 0 | 0.0% | 1,007,000,000.00 | 1,007,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency II
| None | 0 | 0.0% | 125,000,000.00 | 125,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 325,300,000.00 | 325,308,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy II
| None | 0 | 0.0% | 261,000,000.00 | 261,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization I
| None | 0 | 0.0% | 100,100,000.00 | 100,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency I
| None | 0 | 0.0% | 2,032,000,000.00 | 2,032,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency II
| None | 0 | 0.0% | 980,100,000.00 | 980,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor I
| None | 0 | 0.0% | 267,600,000.00 | 267,608,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization I
| None | 0 | 0.0% | 740,300,000.00 | 740,317,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency II
| None | 0 | 0.0% | 985,100,000.00 | 985,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection I
| None | 0 | 0.0% | 90,000,000.00 | 90,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization II
| None | 0 | 0.0% | 581,500,000.00 | 581,508,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer I
| None | 0 | 0.0% | 49,990,000.00 | 50,024,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency I
| None | 0 | 0.0% | 276,100,000.00 | 276,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor II
| None | 0 | 0.0% | 1,051,000,000.00 | 1,051,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency I
| None | 0 | 0.0% | 300,000,000.00 | 300,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection II
| None | 0 | 0.0% | 232,500,000.00 | 232,508,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization I
| None | 0 | 0.0% | 100,100,000.00 | 100,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency I
| None | 0 | 0.0% | 361,200,000.00 | 361,208,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 125,000,000.00 | 125,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency II
| None | 0 | 0.0% | 980,100,000.00 | 980,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor I
| None | 0 | 0.0% | 261,000,000.00 | 261,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization I
| None | 0 | 0.0% | 740,300,000.00 | 740,317,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency II
| None | 0 | 0.0% | 980,100,000.00 | 980,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy I
| None | 0 | 0.0% | 82,790,000.00 | 82,798,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator II
| None | 0 | 0.0% | 573,000,000.00 | 573,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator I
| None | 0 | 0.0% | 49,990,000.00 | 50,024,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency II
| None | 0 | 0.0% | 1,355,000,000.00 | 1,355,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,220,000,000.00 | 2,220,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 269,600,000.00 | 269,608,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor II
| None | 0 | 0.0% | 1,065,000,000.00 | 1,065,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency I
| None | 0 | 0.0% | 276,100,000.00 | 276,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy II
| None | 0 | 0.0% | 232,500,000.00 | 232,508,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator I
| None | 0 | 0.0% | 100,100,000.00 | 100,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator II
| None | 0 | 0.0% | 111,000,000.00 | 111,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability I
| None | 0 | 0.0% | 293,800,000.00 | 293,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency I
| None | 0 | 0.0% | 2,101,000,000.00 | 2,101,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 945,800,000.00 | 945,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency I
| None | 0 | 0.0% | 2,199,000,000.00 | 2,199,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set TE Research Optimization I
| None | 0 | 0.0% | 804,000,000.00 | 804,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency I
| None | 0 | 0.0% | 292,900,000.00 | 292,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing I
| None | 0 | 0.0% | 106,000,000.00 | 106,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization II
| None | 0 | 0.0% | 49,990,000.00 | 49,998,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite I
| None | 0 | 0.0% | 25,000,000.00 | 25,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability II
| None | 0 | 0.0% | 1,297,000,000.00 | 1,297,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency II
| None | 0 | 0.0% | 150,000,000.00 | 150,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 302,200,000.00 | 302,208,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency II
| None | 0 | 0.0% | 125,000,000.00 | 125,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set TE Research Optimization II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency II
| None | 0 | 0.0% | 971,800,000.00 | 971,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing II
| None | 0 | 0.0% | 230,100,000.00 | 230,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization I
| None | 0 | 0.0% | 100,100,000.00 | 100,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency I
| None | 0 | 0.0% | 281,600,000.00 | 281,608,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 250,000,000.00 | 250,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 269,600,000.00 | 269,608,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency I
| None | 0 | 0.0% | 1,505,000,000.00 | 1,505,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization I
| None | 0 | 0.0% | 802,900,000.00 | 802,917,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency I
| None | 0 | 0.0% | 276,100,000.00 | 276,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System I
| None | 0 | 0.0% | 90,010,000.00 | 90,018,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator II
| None | 0 | 0.0% | 581,500,000.00 | 581,508,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 300,200,000.00 | 300,208,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency II
| None | 0 | 0.0% | 1,501,000,000.00 | 1,501,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 946,000,000.00 | 946,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency II
| None | 0 | 0.0% | 500,000,000.00 | 500,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization II
| None | 0 | 0.0% | 49,990,000.00 | 50,007,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency II
| None | 0 | 0.0% | 945,800,000.00 | 945,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System II
| None | 0 | 0.0% | 230,200,000.00 | 230,208,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator I
| None | 0 | 0.0% | 100,100,000.00 | 100,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 945,800,000.00 | 945,808,500.00 | 0.00 | 0.0% | 0.00 |