| Standup XL-Set Laboratory Optimization I
| None | 0 | 0.0% | 13,970,000,000.00 | 13,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator II
| None | 0 | 0.0% | 775,000,000.00 | 775,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 5,357,000,000.00 | 5,357,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency I
| None | 0 | 0.0% | 423,800,000.00 | 423,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency I
| None | 0 | 0.0% | 2,720,000,000.00 | 2,720,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 599,700,000.00 | 599,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection I
| None | 0 | 0.0% | 111,000,000.00 | 111,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency I
| None | 0 | 0.0% | 34,970,000,000.00 | 34,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator II
| None | 0 | 0.0% | 775,000,000.00 | 775,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control I
| None | 0 | 0.0% | 1,574,000,000.00 | 1,574,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency I
| None | 0 | 0.0% | 349,000,000.00 | 349,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency II
| None | 0 | 0.0% | 3,497,000,000.00 | 3,497,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency II
| None | 0 | 0.0% | 19,700,000,000.00 | 19,700,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,400,000,000.00 | 1,400,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection II
| None | 0 | 0.0% | 420,000,000.00 | 420,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator I
| None | 0 | 0.0% | 112,200,000.00 | 112,208,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,675,000,000.00 | 2,675,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor I
| None | 0 | 0.0% | 300,700,000.00 | 300,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency I
| None | 0 | 0.0% | 2,648,000,000.00 | 2,648,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy I
| None | 0 | 0.0% | 117,200,000.00 | 117,208,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Thukker Structure and Component Manufacturing Efficiency
| None | 0 | 0.0% | 34,950,000,000.00 | 34,950,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization II
| None | 0 | 0.0% | 1,325,000,000.00 | 1,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array I
| None | 0 | 0.0% | 1,588,000,000.00 | 1,588,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency I
| None | 0 | 0.0% | 525,000,000.00 | 525,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor II
| None | 0 | 0.0% | 1,479,000,000.00 | 1,479,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 460,000,000.00 | 460,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy II
| None | 0 | 0.0% | 400,100,000.00 | 400,108,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization I
| None | 0 | 0.0% | 106,800,000.00 | 106,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency I
| None | 0 | 0.0% | 4,996,000,000.00 | 4,996,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,750,000,000.00 | 1,750,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor I
| None | 0 | 0.0% | 310,000,000.00 | 310,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization I
| None | 0 | 0.0% | 840,000,000.00 | 840,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,439,000,000.00 | 1,439,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection I
| None | 0 | 0.0% | 113,000,000.00 | 113,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization II
| None | 0 | 0.0% | 1,325,000,000.00 | 1,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer I
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency I
| None | 0 | 0.0% | 599,700,000.00 | 599,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor II
| None | 0 | 0.0% | 1,459,000,000.00 | 1,459,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization II
| None | 0 | 0.0% | 14,970,000,000.00 | 14,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency I
| None | 0 | 0.0% | 422,900,000.00 | 422,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection II
| None | 0 | 0.0% | 449,700,000.00 | 449,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization I
| None | 0 | 0.0% | 115,000,000.00 | 115,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency I
| None | 0 | 0.0% | 384,000,000.00 | 384,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor I
| None | 0 | 0.0% | 290,600,000.00 | 290,608,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization I
| None | 0 | 0.0% | 850,000,000.00 | 850,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,429,000,000.00 | 1,429,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy I
| None | 0 | 0.0% | 113,800,000.00 | 113,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator II
| None | 0 | 0.0% | 775,000,000.00 | 775,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator I
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency II
| None | 0 | 0.0% | 2,820,000,000.00 | 2,820,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 4,969,000,000.00 | 4,969,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 550,000,000.00 | 550,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor II
| None | 0 | 0.0% | 1,439,000,000.00 | 1,439,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization II
| None | 0 | 0.0% | 14,970,000,000.00 | 14,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency I
| None | 0 | 0.0% | 599,700,000.00 | 599,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy II
| None | 0 | 0.0% | 407,900,000.00 | 407,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator I
| None | 0 | 0.0% | 124,000,000.00 | 124,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability I
| None | 0 | 0.0% | 384,000,000.00 | 384,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency I
| None | 0 | 0.0% | 2,994,000,000.00 | 2,994,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency I
| None | 0 | 0.0% | 2,695,000,000.00 | 2,695,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set TE Research Optimization I
| None | 0 | 0.0% | 874,700,000.00 | 874,717,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency I
| None | 0 | 0.0% | 448,900,000.00 | 448,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing I
| None | 0 | 0.0% | 120,000,000.00 | 120,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization II
| None | 0 | 0.0% | 2,197,000,000.00 | 2,197,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite I
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability II
| None | 0 | 0.0% | 2,750,000,000.00 | 2,750,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 599,700,000.00 | 599,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency II
| None | 0 | 0.0% | 32,970,000,000.00 | 32,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set TE Research Optimization II
| None | 0 | 0.0% | 14,960,000,000.00 | 14,960,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,397,000,000.00 | 1,397,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing II
| None | 0 | 0.0% | 397,000,000.00 | 397,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization I
| None | 0 | 0.0% | 112,000,000.00 | 112,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency I
| None | 0 | 0.0% | 549,000,000.00 | 549,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,725,000,000.00 | 2,725,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 575,000,000.00 | 575,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency I
| None | 0 | 0.0% | 2,950,000,000.00 | 2,950,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization I
| None | 0 | 0.0% | 939,000,000.00 | 939,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency I
| None | 0 | 0.0% | 549,000,000.00 | 549,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System I
| None | 0 | 0.0% | 113,700,000.00 | 113,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator II
| None | 0 | 0.0% | 775,000,000.00 | 775,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 355,000,000.00 | 355,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency II
| None | 0 | 0.0% | 3,497,000,000.00 | 3,497,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency II
| None | 0 | 0.0% | 32,960,000,000.00 | 32,960,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization II
| None | 0 | 0.0% | 14,960,000,000.00 | 14,960,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,797,000,000.00 | 1,797,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System II
| None | 0 | 0.0% | 396,800,000.00 | 396,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator I
| None | 0 | 0.0% | 110,000,000.00 | 110,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,397,000,000.00 | 1,397,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Material Efficiency I
| None | 0 | 0.0% | 365,000,000.00 | 365,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 4,790,000,000.00 | 4,790,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,397,000,000.00 | 1,397,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor I
| None | 0 | 0.0% | 3,898,000,000.00 | 3,898,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Basic Capital Component Manufacturing Efficiency
| None | 0 | 0.0% | 4,997,000,000.00 | 4,997,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,493,000,000.00 | 1,493,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor I
| None | 0 | 0.0% | 1,489,000,000.00 | 1,489,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 400,000,000.00 | 400,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency I
| None | 0 | 0.0% | 650,000,000.00 | 650,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Material Efficiency II
| None | 0 | 0.0% | 2,680,000,000.00 | 2,680,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 449,000,000.00 | 449,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor II
| None | 0 | 0.0% | 20,960,000,000.00 | 20,960,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Advanced Component Manufacturing Efficiency
| None | 0 | 0.0% | 4,997,000,000.00 | 4,997,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency I
| None | 0 | 0.0% | 368,900,000.00 | 368,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency I
| None | 0 | 0.0% | 353,800,000.00 | 353,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency I
| None | 0 | 0.0% | 549,000,000.00 | 549,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency I
| None | 0 | 0.0% | 2,695,000,000.00 | 2,695,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 424,000,000.00 | 424,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor I
| None | 0 | 0.0% | 7,986,000,000.00 | 7,986,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency I
| None | 0 | 0.0% | 34,950,000,000.00 | 34,950,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency I
| None | 0 | 0.0% | 599,700,000.00 | 599,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control I
| None | 0 | 0.0% | 1,596,000,000.00 | 1,596,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,400,000,000.00 | 1,400,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency I
| None | 0 | 0.0% | 690,000,000.00 | 690,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency II
| None | 0 | 0.0% | 3,497,000,000.00 | 3,497,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,450,000,000.00 | 1,450,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor II
| None | 0 | 0.0% | 28,950,000,000.00 | 28,950,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,397,000,000.00 | 1,397,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiency
| None | 0 | 0.0% | 499,000,000.00 | 499,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,799,000,000.00 | 1,799,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency I
| None | 0 | 0.0% | 364,000,000.00 | 364,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,695,000,000.00 | 2,695,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 445,000,000.00 | 445,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision I
| None | 0 | 0.0% | 148,000,000.00 | 148,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization II
| None | 0 | 0.0% | 775,000,000.00 | 775,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System I
| None | 0 | 0.0% | 1,995,000,000.00 | 1,995,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Advanced Component Manufacturing Material Efficiency
| None | 0 | 0.0% | 396,000,000.00 | 396,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,397,000,000.00 | 1,397,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency II
| None | 0 | 0.0% | 2,623,000,000.00 | 2,623,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,375,000,000.00 | 1,375,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision II
| None | 0 | 0.0% | 479,000,000.00 | 479,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 269,600,000,000.00 | 269,600,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization I
| None | 0 | 0.0% | 113,000,000.00 | 113,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency I
| None | 0 | 0.0% | 3,897,000,000.00 | 3,897,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,850,000,000.00 | 1,850,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency I
| None | 0 | 0.0% | 475,000,000.00 | 475,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 5,487,000,000.00 | 5,487,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 599,700,000.00 | 599,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection I
| None | 0 | 0.0% | 145,000,000.00 | 145,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Laboratory Optimization II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator I
| None | 0 | 0.0% | 111,200,000.00 | 111,208,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer I
| None | 0 | 0.0% | 1,695,000,000.00 | 1,695,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 599,700,000.00 | 599,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency II
| None | 0 | 0.0% | 3,497,000,000.00 | 3,497,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection II
| None | 0 | 0.0% | 449,000,000.00 | 449,008,500.00 | 0.00 | 0.0% | 0.00 |