| Standup XL-Set Laboratory Optimization I
| None | 0 | 0.0% | 13,970,000,000.00 | 13,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator II
| None | 0 | 0.0% | 1,297,000,000.00 | 1,297,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,996,000,000.00 | 2,996,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency I
| None | 0 | 0.0% | 549,700,000.00 | 549,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency I
| None | 0 | 0.0% | 2,825,000,000.00 | 2,825,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 340,000,000.00 | 340,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection I
| None | 0 | 0.0% | 116,000,000.00 | 116,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency I
| None | 0 | 0.0% | 34,970,000,000.00 | 34,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator II
| None | 0 | 0.0% | 975,000,000.00 | 975,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control I
| None | 0 | 0.0% | 1,625,000,000.00 | 1,625,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency I
| None | 0 | 0.0% | 365,000,000.00 | 365,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency II
| None | 0 | 0.0% | 3,497,000,000.00 | 3,497,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,850,000,000.00 | 1,850,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection II
| None | 0 | 0.0% | 439,000,000.00 | 439,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator I
| None | 0 | 0.0% | 106,000,000.00 | 106,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,825,000,000.00 | 2,825,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor I
| None | 0 | 0.0% | 304,900,000.00 | 304,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency I
| None | 0 | 0.0% | 2,775,000,000.00 | 2,775,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy I
| None | 0 | 0.0% | 101,000,000.00 | 101,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Thukker Structure and Component Manufacturing Efficiency
| None | 0 | 0.0% | 34,950,000,000.00 | 34,950,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization II
| None | 0 | 0.0% | 1,325,000,000.00 | 1,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array I
| None | 0 | 0.0% | 1,325,000,000.00 | 1,325,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency I
| None | 0 | 0.0% | 370,000,000.00 | 370,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor II
| None | 0 | 0.0% | 1,375,000,000.00 | 1,375,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 470,000,000.00 | 470,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy II
| None | 0 | 0.0% | 380,000,000.00 | 380,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization I
| None | 0 | 0.0% | 106,000,000.00 | 106,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency I
| None | 0 | 0.0% | 4,997,000,000.00 | 4,997,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,750,000,000.00 | 1,750,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor I
| None | 0 | 0.0% | 297,000,000.00 | 297,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization I
| None | 0 | 0.0% | 999,700,000.00 | 999,717,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,475,000,000.00 | 1,475,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection I
| None | 0 | 0.0% | 100,000,000.00 | 100,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization II
| None | 0 | 0.0% | 1,325,000,000.00 | 1,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer I
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency I
| None | 0 | 0.0% | 365,000,000.00 | 365,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor II
| None | 0 | 0.0% | 1,397,000,000.00 | 1,397,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization II
| None | 0 | 0.0% | 14,970,000,000.00 | 14,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency I
| None | 0 | 0.0% | 420,000,000.00 | 420,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection II
| None | 0 | 0.0% | 449,700,000.00 | 449,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization I
| None | 0 | 0.0% | 120,000,000.00 | 120,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency I
| None | 0 | 0.0% | 402,000,000.00 | 402,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor I
| None | 0 | 0.0% | 294,300,000.00 | 294,308,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization I
| None | 0 | 0.0% | 1,025,000,000.00 | 1,025,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,850,000,000.00 | 1,850,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy I
| None | 0 | 0.0% | 111,000,000.00 | 111,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator II
| None | 0 | 0.0% | 825,000,000.00 | 825,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator I
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency II
| None | 0 | 0.0% | 2,860,000,000.00 | 2,860,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,775,000,000.00 | 2,775,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 550,000,000.00 | 550,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor II
| None | 0 | 0.0% | 1,430,000,000.00 | 1,430,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization II
| None | 0 | 0.0% | 14,970,000,000.00 | 14,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency I
| None | 0 | 0.0% | 345,000,000.00 | 345,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy II
| None | 0 | 0.0% | 380,000,000.00 | 380,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator I
| None | 0 | 0.0% | 124,000,000.00 | 124,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability I
| None | 0 | 0.0% | 402,000,000.00 | 402,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency I
| None | 0 | 0.0% | 2,997,000,000.00 | 2,997,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency I
| None | 0 | 0.0% | 2,699,000,000.00 | 2,699,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set TE Research Optimization I
| None | 0 | 0.0% | 1,025,000,000.00 | 1,025,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency I
| None | 0 | 0.0% | 355,000,000.00 | 355,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing I
| None | 0 | 0.0% | 120,000,000.00 | 120,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization II
| None | 0 | 0.0% | 2,197,000,000.00 | 2,197,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite I
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability II
| None | 0 | 0.0% | 2,797,000,000.00 | 2,797,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 365,000,000.00 | 365,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency II
| None | 0 | 0.0% | 34,240,000,000.00 | 34,240,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set TE Research Optimization II
| None | 0 | 0.0% | 14,960,000,000.00 | 14,960,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,675,000,000.00 | 1,675,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing II
| None | 0 | 0.0% | 397,000,000.00 | 397,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization I
| None | 0 | 0.0% | 120,000,000.00 | 120,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency I
| None | 0 | 0.0% | 355,000,000.00 | 355,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,825,000,000.00 | 2,825,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 575,000,000.00 | 575,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency I
| None | 0 | 0.0% | 3,225,000,000.00 | 3,225,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization I
| None | 0 | 0.0% | 945,000,000.00 | 945,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency I
| None | 0 | 0.0% | 599,000,000.00 | 599,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System I
| None | 0 | 0.0% | 114,000,000.00 | 114,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator II
| None | 0 | 0.0% | 800,000,000.00 | 800,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 375,000,000.00 | 375,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency II
| None | 0 | 0.0% | 3,497,000,000.00 | 3,497,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency II
| None | 0 | 0.0% | 33,750,000,000.00 | 33,750,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization II
| None | 0 | 0.0% | 14,960,000,000.00 | 14,960,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System II
| None | 0 | 0.0% | 396,800,000.00 | 396,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator I
| None | 0 | 0.0% | 115,000,000.00 | 115,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,779,000,000.00 | 1,779,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Material Efficiency I
| None | 0 | 0.0% | 373,000,000.00 | 373,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,850,000,000.00 | 2,850,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor I
| None | 0 | 0.0% | 3,596,000,000.00 | 3,596,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Basic Capital Component Manufacturing Efficiency
| None | 0 | 0.0% | 4,997,000,000.00 | 4,997,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,325,000,000.00 | 1,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor I
| None | 0 | 0.0% | 1,325,000,000.00 | 1,325,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 400,000,000.00 | 400,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency I
| None | 0 | 0.0% | 650,000,000.00 | 650,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Material Efficiency II
| None | 0 | 0.0% | 2,597,000,000.00 | 2,597,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 449,900,000.00 | 449,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor II
| None | 0 | 0.0% | 22,970,000,000.00 | 22,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Advanced Component Manufacturing Efficiency
| None | 0 | 0.0% | 4,997,000,000.00 | 4,997,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency I
| None | 0 | 0.0% | 340,000,000.00 | 340,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency I
| None | 0 | 0.0% | 380,000,000.00 | 380,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency I
| None | 0 | 0.0% | 355,000,000.00 | 355,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency I
| None | 0 | 0.0% | 2,825,000,000.00 | 2,825,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 425,700,000.00 | 425,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor I
| None | 0 | 0.0% | 7,986,000,000.00 | 7,986,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency I
| None | 0 | 0.0% | 34,950,000,000.00 | 34,950,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency I
| None | 0 | 0.0% | 699,700,000.00 | 699,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control I
| None | 0 | 0.0% | 1,350,000,000.00 | 1,350,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,540,000,000.00 | 1,540,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency I
| None | 0 | 0.0% | 690,000,000.00 | 690,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency II
| None | 0 | 0.0% | 3,497,000,000.00 | 3,497,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,849,000,000.00 | 1,849,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor II
| None | 0 | 0.0% | 28,950,000,000.00 | 28,950,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiency
| None | 0 | 0.0% | 499,000,000.00 | 499,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,897,000,000.00 | 1,897,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency I
| None | 0 | 0.0% | 395,000,000.00 | 395,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,825,000,000.00 | 2,825,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 350,000,000.00 | 350,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision I
| None | 0 | 0.0% | 116,000,000.00 | 116,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 34,970,000,000.00 | 34,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization II
| None | 0 | 0.0% | 800,000,000.00 | 800,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System I
| None | 0 | 0.0% | 1,340,000,000.00 | 1,340,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Advanced Component Manufacturing Material Efficiency
| None | 0 | 0.0% | 396,000,000.00 | 396,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,450,000,000.00 | 1,450,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency II
| None | 0 | 0.0% | 2,623,000,000.00 | 2,623,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 1,410,000,000.00 | 1,410,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision II
| None | 0 | 0.0% | 425,000,000.00 | 425,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 269,600,000,000.00 | 269,600,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization I
| None | 0 | 0.0% | 138,000,000.00 | 138,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency I
| None | 0 | 0.0% | 3,750,000,000.00 | 3,750,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,850,000,000.00 | 1,850,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency I
| None | 0 | 0.0% | 549,000,000.00 | 549,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 2,824,000,000.00 | 2,824,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 365,000,000.00 | 365,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection I
| None | 0 | 0.0% | 117,000,000.00 | 117,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Laboratory Optimization II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator I
| None | 0 | 0.0% | 110,000,000.00 | 110,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer I
| None | 0 | 0.0% | 1,345,000,000.00 | 1,345,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 370,000,000.00 | 370,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency II
| None | 0 | 0.0% | 3,497,000,000.00 | 3,497,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 19,970,000,000.00 | 19,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 1,875,000,000.00 | 1,875,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection II
| None | 0 | 0.0% | 449,000,000.00 | 449,008,500.00 | 0.00 | 0.0% | 0.00 |