| Prototype Jump Drive Economizer | 4.2 | 17 | 404.8% | 439,000,000.00 | 442,500,000.00 | 599,800,000.00 | 35.5% | 2,718,006,666.67 |
| Experimental Jump Drive Economizer | 37.1 | 70 | 188.7% | 21,850,000.00 | 25,350,000.00 | 29,550,000.00 | 16.6% | 1,100,173,566.33 |
| Limited Jump Drive Economizer | 1.2 | 55 | 4,583.3% | 5,994,000.00 | 9,494,000.00 | 37,570,000.00 | 295.7% | 43,880,666.67 |