| Standup M-Set Composite Reactor Material Efficiency I | None | 0 | 0.0% | 414,800,000.00 | 414,810,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency I | None | 0 | 0.0% | 2,797,000,000.00 | 2,797,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,849,000,000.00 | 1,849,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor I | None | 0 | 0.0% | 4,496,000,000.00 | 4,496,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Basic Capital Component Manufacturing Efficiency | None | 0 | 0.0% | 4,997,000,000.00 | 4,997,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,525,000,000.00 | 1,525,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor I | None | 0 | 0.0% | 1,475,000,000.00 | 1,475,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I | None | 0 | 0.0% | 455,000,000.00 | 455,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency I | None | 0 | 0.0% | 650,000,000.00 | 650,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Material Efficiency II | None | 0 | 0.0% | 3,097,000,000.00 | 3,097,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I | None | 0 | 0.0% | 410,000,000.00 | 410,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor II | None | 0 | 0.0% | 25,970,000,000.00 | 25,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Advanced Component Manufacturing Efficiency | None | 0 | 0.0% | 4,997,000,000.00 | 4,997,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency I | None | 0 | 0.0% | 395,000,000.00 | 395,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency I | None | 0 | 0.0% | 395,000,000.00 | 395,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,850,000,000.00 | 1,850,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency I | None | 0 | 0.0% | 395,000,000.00 | 395,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency I | None | 0 | 0.0% | 2,797,000,000.00 | 2,797,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency I | None | 0 | 0.0% | 490,000,000.00 | 490,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor I | None | 0 | 0.0% | 7,986,000,000.00 | 7,986,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency I | None | 0 | 0.0% | 34,950,000,000.00 | 34,950,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency I | None | 0 | 0.0% | 383,000,000.00 | 383,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control I | None | 0 | 0.0% | 1,497,000,000.00 | 1,497,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,849,000,000.00 | 1,849,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency I | None | 0 | 0.0% | 649,000,000.00 | 649,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency II | None | 0 | 0.0% | 3,497,000,000.00 | 3,497,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,489,000,000.00 | 1,489,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor II | None | 0 | 0.0% | 28,950,000,000.00 | 28,950,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,495,000,000.00 | 1,495,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiency | None | 0 | 0.0% | 499,000,000.00 | 499,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,799,000,000.00 | 1,799,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency I | None | 0 | 0.0% | 361,000,000.00 | 361,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency I | None | 0 | 0.0% | 2,697,000,000.00 | 2,697,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I | None | 0 | 0.0% | 390,000,000.00 | 390,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision I | None | 0 | 0.0% | 116,000,000.00 | 116,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency I | None | 0 | 0.0% | 34,970,000,000.00 | 34,970,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization II | None | 0 | 0.0% | 784,000,000.00 | 784,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System I | None | 0 | 0.0% | 1,425,000,000.00 | 1,425,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Advanced Component Manufacturing Material Efficiency | None | 0 | 0.0% | 396,000,000.00 | 396,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,565,000,000.00 | 1,565,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency II | None | 0 | 0.0% | 2,623,000,000.00 | 2,623,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,549,000,000.00 | 1,549,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision II | None | 0 | 0.0% | 395,000,000.00 | 395,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency II | None | 0 | 0.0% | 269,600,000,000.00 | 269,600,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization I | None | 0 | 0.0% | 124,800,000.00 | 124,810,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency I | None | 0 | 0.0% | 2,997,000,000.00 | 2,997,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,850,000,000.00 | 1,850,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency I | None | 0 | 0.0% | 515,000,000.00 | 515,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency I | None | 0 | 0.0% | 2,697,000,000.00 | 2,697,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I | None | 0 | 0.0% | 410,000,000.00 | 410,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection I | None | 0 | 0.0% | 120,700,000.00 | 120,710,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Laboratory Optimization II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator I | None | 0 | 0.0% | 123,000,000.00 | 123,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer I | None | 0 | 0.0% | 1,425,000,000.00 | 1,425,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency I | None | 0 | 0.0% | 397,000,000.00 | 397,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency II | None | 0 | 0.0% | 3,497,000,000.00 | 3,497,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,875,000,000.00 | 1,875,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection II | None | 0 | 0.0% | 499,700,000.00 | 499,710,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Laboratory Optimization I | None | 0 | 0.0% | 13,970,000,000.00 | 13,970,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator II | None | 0 | 0.0% | 795,000,000.00 | 795,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency I | None | 0 | 0.0% | 2,997,000,000.00 | 2,997,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,850,000,000.00 | 1,850,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency I | None | 0 | 0.0% | 388,000,000.00 | 388,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency I | None | 0 | 0.0% | 2,797,000,000.00 | 2,797,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I | None | 0 | 0.0% | 410,000,000.00 | 410,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection I | None | 0 | 0.0% | 130,000,000.00 | 130,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency I | None | 0 | 0.0% | 34,970,000,000.00 | 34,970,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator II | None | 0 | 0.0% | 989,000,000.00 | 989,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control I | None | 0 | 0.0% | 1,490,000,000.00 | 1,490,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency I | None | 0 | 0.0% | 549,000,000.00 | 549,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency II | None | 0 | 0.0% | 3,497,000,000.00 | 3,497,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency II | None | 0 | 0.0% | 19,700,000,000.00 | 19,700,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,565,000,000.00 | 1,565,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection II | None | 0 | 0.0% | 420,000,000.00 | 420,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator I | None | 0 | 0.0% | 117,900,000.00 | 117,910,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency I | None | 0 | 0.0% | 2,697,000,000.00 | 2,697,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,875,000,000.00 | 1,875,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor I | None | 0 | 0.0% | 309,000,000.00 | 309,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency I | None | 0 | 0.0% | 3,497,000,000.00 | 3,497,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,875,000,000.00 | 1,875,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy I | None | 0 | 0.0% | 112,000,000.00 | 112,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Thukker Structure and Component Manufacturing Efficiency | None | 0 | 0.0% | 34,950,000,000.00 | 34,950,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization II | None | 0 | 0.0% | 1,297,000,000.00 | 1,297,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array I | None | 0 | 0.0% | 1,525,000,000.00 | 1,525,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency I | None | 0 | 0.0% | 399,400,000.00 | 399,410,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor II | None | 0 | 0.0% | 1,695,000,000.00 | 1,695,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency I | None | 0 | 0.0% | 440,000,000.00 | 440,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy II | None | 0 | 0.0% | 444,000,000.00 | 444,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization I | None | 1 | 10,000.0% | 113,600,000.00 | 113,610,000.00 | 200,000,000.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency I | None | 0 | 0.0% | 4,997,000,000.00 | 4,997,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,750,000,000.00 | 1,750,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor I | None | 0 | 0.0% | 314,000,000.00 | 314,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization I | None | 0 | 0.0% | 999,900,000.00 | 999,920,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,565,000,000.00 | 1,565,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection I | None | 0 | 0.0% | 110,000,000.00 | 110,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization II | None | 0 | 0.0% | 1,297,000,000.00 | 1,297,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer I | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency I | None | 0 | 0.0% | 399,700,000.00 | 399,710,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor II | None | 0 | 0.0% | 1,590,000,000.00 | 1,590,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization II | None | 0 | 0.0% | 14,970,000,000.00 | 14,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency I | None | 0 | 0.0% | 385,000,000.00 | 385,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection II | None | 0 | 0.0% | 479,000,000.00 | 479,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization I | None | 0 | 0.0% | 135,100,000.00 | 135,110,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency I | None | 0 | 0.0% | 408,000,000.00 | 408,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,875,000,000.00 | 1,875,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor I | None | 0 | 0.0% | 308,700,000.00 | 308,710,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization I | None | 0 | 0.0% | 970,000,000.00 | 970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,797,000,000.00 | 1,797,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy I | None | 0 | 0.0% | 116,000,000.00 | 116,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator II | None | 0 | 0.0% | 794,800,000.00 | 794,810,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator I | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency II | None | 0 | 0.0% | 2,820,000,000.00 | 2,820,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency I | None | 0 | 0.0% | 2,797,000,000.00 | 2,797,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency I | None | 0 | 0.0% | 550,000,000.00 | 550,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor II | None | 0 | 0.0% | 1,599,000,000.00 | 1,599,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization II | None | 0 | 0.0% | 14,970,000,000.00 | 14,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency I | None | 0 | 0.0% | 410,000,000.00 | 410,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy II | None | 0 | 0.0% | 426,000,000.00 | 426,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator I | None | 0 | 0.0% | 122,000,000.00 | 122,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability I | None | 0 | 0.0% | 400,000,000.00 | 400,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency I | None | 0 | 0.0% | 2,750,000,000.00 | 2,750,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,850,000,000.00 | 1,850,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency I | None | 0 | 0.0% | 2,950,000,000.00 | 2,950,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set TE Research Optimization I | None | 0 | 0.0% | 1,075,000,000.00 | 1,075,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency I | None | 0 | 0.0% | 397,200,000.00 | 397,210,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing I | None | 0 | 0.0% | 120,000,000.00 | 120,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization II | None | 0 | 0.0% | 2,197,000,000.00 | 2,197,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite I | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,040,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability II | None | 0 | 0.0% | 2,786,000,000.00 | 2,786,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency I | None | 0 | 0.0% | 395,000,000.00 | 395,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency II | None | 0 | 0.0% | 38,400,000,000.00 | 38,400,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set TE Research Optimization II | None | 0 | 0.0% | 14,960,000,000.00 | 14,960,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,697,000,000.00 | 1,697,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing II | None | 0 | 0.0% | 397,000,000.00 | 397,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization I | None | 0 | 0.0% | 170,000,000.00 | 170,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite II | None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency I | None | 0 | 0.0% | 410,000,000.00 | 410,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency I | None | 0 | 0.0% | 2,697,000,000.00 | 2,697,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency I | None | 0 | 0.0% | 549,000,000.00 | 549,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency I | None | 0 | 0.0% | 3,035,000,000.00 | 3,035,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization I | None | 0 | 0.0% | 915,000,000.00 | 915,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency I | None | 0 | 0.0% | 425,000,000.00 | 425,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System I | None | 0 | 0.0% | 129,000,000.00 | 129,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator II | None | 0 | 0.0% | 790,000,000.00 | 790,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I | None | 0 | 0.0% | 450,000,000.00 | 450,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency II | None | 0 | 0.0% | 3,497,000,000.00 | 3,497,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency II | None | 0 | 0.0% | 19,970,000,000.00 | 19,970,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,875,000,000.00 | 1,875,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency II | None | 0 | 0.0% | 44,960,000,000.00 | 44,960,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization II | None | 0 | 0.0% | 14,960,000,000.00 | 14,960,020,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency II | None | 0 | 0.0% | 1,825,000,000.00 | 1,825,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System II | None | 0 | 0.0% | 430,000,000.00 | 430,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator I | None | 0 | 0.0% | 126,000,000.00 | 126,010,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency II | None | 0 | 0.0% | 1,775,000,000.00 | 1,775,010,000.00 | 0.00 | 0.0% | 0.00 |