Standup L-Set Drone and Fighter Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Equipment Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Basic Capital Component Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Invention Optimization I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Equipment Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Basic Capital Component Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set ME Research Optimization I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Ammunition Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Structure Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Structure Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Ammunition Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Structure Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set TE Research Optimization I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Drone and Fighter Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Invention Cost Optimization I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Drone and Fighter Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Invention Accelerator I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Basic Small Ship Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set ME Research Cost Optimization I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Basic Small Ship Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set ME Research Accelerator I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set TE Research Cost Optimization I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set TE Research Accelerator I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Basic Large Ship Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Blueprint Copy Cost Optimization I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Ammunition Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Basic Large Ship Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Blueprint Copy Accelerator I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup XL-Set Equipment and Consumable Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Advanced Medium Ship Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Basic Large Ship Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Advanced Small Ship Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Advanced Small Ship Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Advanced Large Ship Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Basic Capital Component Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Equipment Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Basic Medium Ship Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Advanced Component Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Basic Small Ship Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup XL-Set Ship Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Advanced Large Ship Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Blueprint Copy Optimization I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup XL-Set Laboratory Optimization I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Advanced Component Manufacturing Material Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup L-Set Capital Ship Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup XL-Set Structure and Component Manufacturing Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
Standup M-Set Advanced Component Manufacturing Time Efficiency I Blueprint
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |